Upgrading of older model FRAME 5000 and FRAME 7000. General Electric Gas Turbines can be modified to include the
latest standards in technology which results in increased
performance, higher efficiency, and increased maintenance inspection
intervals.Vertical stacking pit for steam and gas
turbines. Run out of Frame 7E compressor rotor in long lathe.
External
sand blast booth.
|

Assembly of
Hi-Tech rotor casing after bearing and casing modifications.
|

Shipping flange to
flange Hi-Tech Frame 5000 from Jacksonville, FL.
|
Frame 5 gas turbine/compressor
assembly after complete restacking
of rotor and coating blades with
"Sermatech"
Cranes
Center bay
is equipped with two (2) 25 ton with 25' under the hook.
Front bay crane
capacity is ten (10) tons
Testing
Equipment
P920
MAGNAFLUX machine.
Mark IV model sonic-ultrasonic
testing machine.
Liquid Dye Penetrant
Tel.
(904) 783-4504 - Fax. (904) 783-6008
6555 Trade Center Drive, Jacksonville, FL. 32254 |