Upgrading of older model FRAME 5000 and FRAME 7000.  General Electric Gas Turbines can be modified to include the latest standards in technology which results in increased performance, higher efficiency, and increased maintenance inspection intervals.Vertical stacking pit for steam and gas turbines. Run out of Frame 7E compressor rotor in long lathe. External sand blast booth.


Assembly of Hi-Tech rotor casing after bearing and casing modifications.


Shipping flange to flange Hi-Tech Frame 5000 from Jacksonville, FL.


Frame 5 gas turbine/compressor
assembly after complete restacking 
of rotor and coating blades with
"Sermatech"

Cranes

     Center bay is equipped with two (2) 25 ton with 25' under the hook. 
     Front bay crane capacity is ten (10) tons

Testing Equipment

     P920 MAGNAFLUX machine.
    
Mark IV model sonic-ultrasonic testing machine.
     Liquid Dye Penetrant

 

Tel. (904) 783-4504 - Fax. (904) 783-6008
6555 Trade Center Drive, Jacksonville, FL. 32254